Micro-Generation Application

 

If you have questions on how to fill in the form, refer to the “Micro-Generation / Distributed Energy Resource Interconnection Guide” posted on the City’s website under Microgeneration.

General Information

Micro-Generation Owner:

Contractor:

Is the Invoice Billing Information different for the Contractor?
 

Micro-Generation Service

Energy source of the generator:
 
Are you an existing micro-generation customer?
 
Service For:
 
Location:
 
Phase:
 

Note: Your total DC capacity can not go over the maximum approved DC size.

Note: The Electrical Utility evaluates their infrastructure based on the amount of AC power that could be exported. This is determined by the lesser of the total solar photovoltaic wattage or the total inverter wattage.

Type of generator connected to the utility interface:
 
Have you reviewed the "Micro-Generation/Distribution Energy Resource Interconnection Guide"?
 
The Inverter will be setup to follow the AESO - DER Ride-Through Performance Recommendations (March 2021) for Voltage & Frequency Tripping Requirements? Refer to Micro-Generation/Distribution Energy Resource Interconnection Guide Section 14 & Section 15.
 

Note: The micro-generation customer must ensure that the criteria for an exemption from filing an application with the Alberta Utilities commission (AUC) as stated in Section 2 of Rule 007 are satisfied.

Have you met all applicable municipal and zoning requirements, including noise rules and by-laws?
 
Have you completed the participant involvement program stating in the AUC Rule 007?
 
Have you met the requirements stated in the AUC Rule 012 Noise Control?
 
Have you met all applicable environmental requirements?
 
Are you aware of any outstanding objections from any person regarding your project?