Form Builder

Required fields are marked with asterisks (*)

Micro-Generation Application

 

If you have questions on how to fill in the form, refer to the “Micro-Generation / Distributed Energy Resource Interconnection Guide” posted on the City’s website under Microgeneration.

General Information

Micro-Generation Owner:

Contractor:

Micro-Generation Service

Note: Your total DC capacity can not go over the maximum approved DC size.

Note: The Electrical Utility evaluates their infrastructure based on the amount of AC power that could be exported. This is determined by the lesser of the total solar photovoltaic wattage or the total inverter wattage.

Note: The micro-generation customer must ensure that the criteria for an exemption from filing an application with the Alberta Utilities commission (AUC) as stated in Section 2 of Rule 007 are satisfied.